Modern technology gives us many things.

road closure shepparton

3

road closure shepparton, The road closure in Shepparton is due to construction that will start on September 5th, 2022. This closure will affect the federal highway 180 and the section from junction L 190 (Teuchern). Motorists are advised to take an alternative route.

</p>
<h2>road closure shepparton</h2>
<p>

road closure shepparton

Due to construction, the

road closure shepparton

will be closed for the next few weeks. Pedestrians and cyclists will be directed to take a detour around the construction site. The detour takes place via the B87. This measure is necessary in order to ensure the safety of everyone involved. Thank you for your understanding and cooperation.

Read More:

vic road closures near shepparton vic
ripple road medical centre

Goulburn Valley Highway

Goulburn Valley Highway

The Goulburn Valley Highway is a vital artery for the city of Shepparton and the surrounding area. The closure of this highway would have a significant impact on the community. The Victorian Government has committed $10.2 million to help prepare for the Shepparton Bypass. This bypass will provide a fully duplicated highway and relieve congestion in the city.

Ardmona-Toora Road

Ardmona-Toora Road

The Shepparton Ardmona-Toora Road will be closed for two weeks in order to fix the road. This may cause some inconvenience to drivers but it is necessary in order to maintain the safety of the road. The closure will also allow for the repair of any damage that has been caused by recent weather conditions.
We understand that this closure may cause some inconvenience but we would like to remind drivers that the safety of the road is our number one priority. We appreciate your patience and understanding while we work to fix the road.

Dookie Road

Dookie Road

The Greater Shepparton City Council is commencing works to upgrade the New Dookie Road and Wheeler Street intersection to better manage traffic flow through the area. This will result in the closure of Dookie Road to through traffic between Collins Avenue and Wheeler Street from Monday 3 August 2020 until Friday 28 August 2020, weather permitting.

During this time, traffic travelling in both directions on New Dookie Road will be able to turn right into Wheeler Street, however through traffic will not be able to continue straight ahead. Traffic travelling in both directions on New Dookie Road will be able to turn left into Collins Avenue, however through traffic will not be able to continue straight ahead.

The works being undertaken as part of this project will improve safety and efficiency at this intersection and we thank you for your patience while these important works are carried out.

Tatura East Road

Tatura East Road

The Shepparton East Road is set to close for a period of time, and this has caused some controversy in the community. Some believe that the road closure is necessary in order to carry out repairs, while others believe that it will cause unnecessary inconvenience.

Mooroopna North Road

Mooroopna North Road

The Shepparton Mooroopna North Road is a vital piece of infrastructure for the local community. It provides access to essential services and amenities, and is used by residents on a daily basis.

However, the road is in a poor state of repair and has been subject to several closures in recent months. This has caused significant disruption for local residents, who have been forced to find alternative routes or miss out on important appointments.

The council needs to take action to repair the road and prevent further closures. This will reduce the inconvenience and disruption caused to local residents, and ensure that they can continue to access the services and amenities they rely on.

Tatura Irrigation District (TID) Main Channel Upgrade Works on Dookie Road, Tatura East Road and Undera Road. Undera Road between Dookie Road and Murchison-Toolamba Road will be CLOSED to through traffic from Sunday 19 November 2017 for up to eight weeks, weather permitting. Local traffic will be able to access properties located within the closure. Detours will be via Dookie Road, Murchison-Toolamba Road, Toolamba West Road and Undera Road. Please note: The TID Main Channel Upgrade Works are being delivered by Goulburn-Murray Water (GMW) and the road closure is

Tatura Irrigation District (TID) Main Channel Upgrade Works on Dookie Road, Tatura East Road and Undera Road. Undera Road between Dookie Road and Murchison-Toolamba Road will be CLOSED to through traffic from Sunday 19 November 2017 for up to eight weeks, weather permitting. Local traffic will be able to access properties located within the closure. Detours will be via Dookie Road, Murchison-Toolamba Road, Toolamba West Road and Undera Road. Please note: The TID Main Channel Upgrade Works are being delivered by Goulburn-Murray Water (GMW) and the road closure is

Dookie Road between Undera Road and Murchison-Toolamba Road will be CLOSED to through traffic from Sunday 19 November 2017 for up to eight weeks, weather permitting. Local traffic will be able to access properties located within the closure. Detours will be via Undera Road, Toolamba West Road, Murchison-Toolamba Road and Dookie Road. Please note: The TID Main Channel Upgrade Works are being delivered by Goulburn-Murray Water (GMW) and

The Tatura Irrigation District (TID) Main Channel Upgrade Works are being delivered by Goulburn-Murray Water (GMW) and the road closure is required to enable works to be undertaken safely.

The works will improve the reliability of irrigation supplies for local farmers and the wider Goulburn Murray region by upgrading sections of the Main Channel.

We apologise for any inconvenience caused and thank you for your patience while these important works